Triple
T18054221
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harbor Deepening Project of the Port of New York and New Jersey |
E431995
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | capital construction project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: capital construction project Context triple: [Harbor Deepening Project of the Port of New York and New Jersey, instanceOf, capital construction project]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
-
C.
building society
A building society is a member-owned financial institution that primarily offers savings accounts and mortgage lending, operating on a mutual, not-for-profit basis.
-
D.
government infrastructure pipeline
A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
-
E.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b906482481908183315b9ecf9994 |
completed | April 10, 2026, 8:47 a.m. |
Created at: April 10, 2026, 10:26 a.m.