Triple

T18054221
Position Surface form Disambiguated ID Type / Status
Subject Harbor Deepening Project of the Port of New York and New Jersey E431995 entity
Predicate instanceOf P0 FINISHED
Object capital construction project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: capital construction project
Context triple: [Harbor Deepening Project of the Port of New York and New Jersey, instanceOf, capital construction project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • C. building society
    A building society is a member-owned financial institution that primarily offers savings accounts and mortgage lending, operating on a mutual, not-for-profit basis.
  • D. government infrastructure pipeline
    A government infrastructure pipeline is a structured, long-term sequence of planned, funded, and prioritized public works projects—such as transportation, utilities, and civic facilities—designed to guide investment, development, and maintenance of essential national or regional infrastructure.
  • E. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b906482481908183315b9ecf9994 completed April 10, 2026, 8:47 a.m.
Created at: April 10, 2026, 10:26 a.m.