Triple
T18035717
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wassaic station |
E431502
|
entity |
| Predicate | electrificationLimitDirection |
P129533
|
FINISHED |
| Object | south of Wassaic station |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: south of Wassaic station | Statement: [Wassaic station, electrificationLimitDirection, south of Wassaic station]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electrificationLimitDirection Context triple: [Wassaic station, electrificationLimitDirection, south of Wassaic station]
-
A.
electrificationUsedBy
Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
-
B.
electrificationCompatibility
Indicates whether one entity can be effectively and safely powered, charged, or operated using the electrical system, standards, or infrastructure associated with another entity.
-
C.
electrificationEnd
Indicates the point in time or event at which an electrification process or electrified state comes to an end.
-
D.
electrificationUsedFor
Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
-
E.
electrificationUsedBetween
Indicates that an electrification system or method is applied or present along the segment or connection between two entities.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9050fb48190890155145deb0a66 |
completed | April 10, 2026, 8:47 a.m. |
| NER | Named-entity recognition | batch_69e4be39a7348190a75735fe56c78fc3 |
completed | April 19, 2026, 11:36 a.m. |
| PD | Predicate disambiguation | batch_69e3f908da508190a088aa837ea5b7af |
completed | April 18, 2026, 9:35 p.m. |
| PDg | Predicate description generation | batch_69e42d8eefa88190a700c7c1b4213e46 |
completed | April 19, 2026, 1:19 a.m. |
Created at: April 10, 2026, 10:25 a.m.