Triple

T18010573
Position Surface form Disambiguated ID Type / Status
Subject Talbingo E430866 entity
Predicate associatedWith P37 FINISHED
Object Snowy Mountains Hydro-Electric Scheme NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Mountains Hydro-Electric Scheme | Statement: [Talbingo, associatedWith, Snowy Mountains Hydro-Electric Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy Mountains Hydro-Electric Scheme
Context triple: [Talbingo, associatedWith, Snowy Mountains Hydro-Electric Scheme]
  • A. Snowy Hydro Scheme chosen
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • B. Queanbeyan–Canberra water supply scheme
    The Queanbeyan–Canberra water supply scheme is a regional water management system that provides and regulates potable water for the Canberra and Queanbeyan area in southeastern Australia.
  • C. Goldfields Water Supply Scheme
    The Goldfields Water Supply Scheme is a historic Australian engineering project that transports water over hundreds of kilometers from Perth to the arid Eastern Goldfields region of Western Australia.
  • D. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • E. Bridge River Power Project
    The Bridge River Power Project is a major hydroelectric development in British Columbia, Canada, consisting of dams, reservoirs, and power stations that harness the Bridge River system to generate electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b904530081908bf341d842464856 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e4b51f0a488190bd34e1f9039f4dc9 completed April 19, 2026, 10:57 a.m.
Created at: April 10, 2026, 10:24 a.m.