Triple

T17992751
Position Surface form Disambiguated ID Type / Status
Subject A Petition to the President of the United States E430416 entity
Predicate associatedWith P37 FINISHED
Object Chicago Pile research group NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chicago Pile research group | Statement: [A Petition to the President of the United States, associatedWith, Chicago Pile research group]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chicago Pile research group
Context triple: [A Petition to the President of the United States, associatedWith, Chicago Pile research group]
  • A. Chicago Pile-3
    Chicago Pile-3 was an early heavy-water moderated nuclear reactor built at Argonne National Laboratory, notable as one of the first reactors designed for research on reactor physics and materials.
  • B. Chicago Pile-2
    Chicago Pile-2 was an early research nuclear reactor built at the Argonne site to continue and expand experimental work following the first controlled chain reaction achieved by Chicago Pile-1.
  • C. Chicago Pile-1
    Chicago Pile-1 was the world’s first artificial nuclear reactor, achieving the first controlled, self-sustaining nuclear chain reaction in 1942 under the leadership of Enrico Fermi.
  • D. Radiation Laboratory
    Radiation Laboratory was the original name of what is now Lawrence Berkeley National Laboratory, a pioneering U.S. research center known for its groundbreaking work in nuclear and particle physics.
  • E. Knolls Atomic Power Laboratory
    Knolls Atomic Power Laboratory is a U.S. Navy–funded research and development facility that designs, tests, and supports nuclear propulsion systems for the United States naval fleet.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chicago Pile research group
Target entity description: The Chicago Pile research group was the team of scientists at the University of Chicago that built the world’s first controlled nuclear chain reaction during the Manhattan Project.
  • A. Chicago Pile-3
    Chicago Pile-3 was an early heavy-water moderated nuclear reactor built at Argonne National Laboratory, notable as one of the first reactors designed for research on reactor physics and materials.
  • B. Chicago Pile-2
    Chicago Pile-2 was an early research nuclear reactor built at the Argonne site to continue and expand experimental work following the first controlled chain reaction achieved by Chicago Pile-1.
  • C. Chicago Pile-1 chosen
    Chicago Pile-1 was the world’s first artificial nuclear reactor, achieving the first controlled, self-sustaining nuclear chain reaction in 1942 under the leadership of Enrico Fermi.
  • D. Radiation Laboratory
    Radiation Laboratory was the original name of what is now Lawrence Berkeley National Laboratory, a pioneering U.S. research center known for its groundbreaking work in nuclear and particle physics.
  • E. Knolls Atomic Power Laboratory
    Knolls Atomic Power Laboratory is a U.S. Navy–funded research and development facility that designs, tests, and supports nuclear propulsion systems for the United States naval fleet.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b90364248190a37381adea932f42 completed April 10, 2026, 8:46 a.m.
NER Named-entity recognition batch_69e4b2a0f8588190b6090c7cce60a35f completed April 19, 2026, 10:46 a.m.
Created at: April 10, 2026, 10:23 a.m.