Triple

T17967026
Position Surface form Disambiguated ID Type / Status
Subject Richland County, Illinois E449236 entity
Predicate hasMajorHighway P385 FINISHED
Object Illinois Route 250 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Illinois Route 250 | Statement: [Richland County, Illinois, hasMajorHighway, Illinois Route 250]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Illinois Route 250
Context triple: [Richland County, Illinois, hasMajorHighway, Illinois Route 250]
  • A. Illinois Route 251
    Illinois Route 251 is a north–south state highway in northern Illinois that generally follows the former alignment of U.S. Route 51, serving communities parallel to Interstate 39.
  • B. Illinois Route 29
    Illinois Route 29 is a north–south state highway in central Illinois that runs along the Illinois River, connecting cities such as Pekin, Peoria, and Springfield.
  • C. Illinois Route 24
    Illinois Route 24 is a state highway in Illinois that runs east–west across the central part of the state, connecting several mid-sized communities and intersecting major north–south routes.
  • D. Illinois Route 267
    Illinois Route 267 is a north–south state highway in west-central Illinois that connects several rural communities and serves as a regional transportation corridor.
  • E. Illinois Route 23
    Illinois Route 23 is a north–south state highway in northern Illinois that connects several communities, including the city of DeKalb, and serves as a key regional transportation corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Illinois Route 250
Target entity description: Illinois Route 250 is a state highway in southeastern Illinois that runs through rural communities and connects local roads to larger regional routes.
  • A. Illinois Route 251
    Illinois Route 251 is a north–south state highway in northern Illinois that generally follows the former alignment of U.S. Route 51, serving communities parallel to Interstate 39.
  • B. Illinois Route 29
    Illinois Route 29 is a north–south state highway in central Illinois that runs along the Illinois River, connecting cities such as Pekin, Peoria, and Springfield.
  • C. Illinois Route 24
    Illinois Route 24 is a state highway in Illinois that runs east–west across the central part of the state, connecting several mid-sized communities and intersecting major north–south routes.
  • D. Illinois Route 267
    Illinois Route 267 is a north–south state highway in west-central Illinois that connects several rural communities and serves as a regional transportation corridor.
  • E. Illinois Route 23
    Illinois Route 23 is a north–south state highway in northern Illinois that connects several communities, including the city of DeKalb, and serves as a key regional transportation corridor.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f9927c8190a006110c8b996e61 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4b13935908190b5269a84a3df2460 completed April 19, 2026, 10:40 a.m.
Created at: April 10, 2026, 10:22 a.m.