Triple

T17965567
Position Surface form Disambiguated ID Type / Status
Subject Chebanse, Illinois E449195 entity
Predicate roadAccess P385 FINISHED
Object U.S. Route 45 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 45 | Statement: [Chebanse, Illinois, roadAccess, U.S. Route 45]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 45
Context triple: [Chebanse, Illinois, roadAccess, U.S. Route 45]
  • A. U.S. Route 45 chosen
    U.S. Route 45 is a major north–south United States highway that runs from the Gulf Coast in Mississippi through several Midwestern states to the Upper Peninsula of Michigan.
  • B. U.S. Route 75
    U.S. Route 75 is a major north–south U.S. Highway running from Texas through the central United States, serving as a key transportation corridor for cities such as Dallas.
  • C. U.S. Route 59
    U.S. Route 59 is a north–south United States highway that runs from the Mexico–U.S. border in Texas to the Canada–U.S. border in Minnesota, passing through several central states.
  • D. U.S. Route 77
    U.S. Route 77 is a major north–south U.S. Highway running from the Mexican border in Texas through several central states to its northern terminus in Iowa.
  • E. U.S. Route 181
    U.S. Route 181 is a U.S. Highway in southern Texas that runs north from Corpus Christi, serving as a key regional connector through several coastal and inland communities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f9927c8190a006110c8b996e61 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4b1380960819089a3c0dd7cd57e5e completed April 19, 2026, 10:40 a.m.
Created at: April 10, 2026, 10:22 a.m.