Triple

T17960804
Position Surface form Disambiguated ID Type / Status
Subject ODI E449074 entity
Predicate inningsEndConditions P29156 FINISHED
Object overs completed LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: overs completed | Statement: [ODI, inningsEndConditions, overs completed]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: inningsEndConditions
Context triple: [ODI, inningsEndConditions, overs completed]
  • A. terminationCondition chosen
    Indicates the condition or set of conditions under which an ongoing process, activity, or relationship is brought to an end.
  • B. terminalCondition
    Indicates the condition or set of conditions under which a process, interaction, or state is considered complete and should terminate.
  • C. terminatesOn
    Indicates that one process, event, or state causes or marks the ending of another at a specific time or condition.
  • D. terminationEndedIn
    Indicates that a termination event concluded with a specific outcome or result.
  • E. returnCondition
    Indicates the terms, state, or circumstances under which something that was previously given, lent, or transferred is expected or required to be returned.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f8cca8819099836916c56b7c95 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4b131fa8481908cd756f350eb6359 completed April 19, 2026, 10:40 a.m.
PD Predicate disambiguation batch_69e3f8f2bd088190b1e22ad4d9cc8b13 completed April 18, 2026, 9:34 p.m.
Created at: April 10, 2026, 10:22 a.m.