Triple
T17947663
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sir Adam Beck |
E448746
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydroelectric power advocate |
C40178
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydroelectric power advocate Context triple: [Sir Adam Beck, instanceOf, hydroelectric power advocate]
-
A.
hydropower authority
A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
-
B.
hydroelectric power project proposal
A hydroelectric power project proposal is a formal document outlining the technical, environmental, financial, and regulatory plans for developing a facility that generates electricity from flowing or falling water.
-
C.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
D.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
E.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f8cca8819099836916c56b7c95 |
completed | April 10, 2026, 8:51 a.m. |
Created at: April 10, 2026, 10:21 a.m.