Triple

T17947663
Position Surface form Disambiguated ID Type / Status
Subject Sir Adam Beck E448746 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power advocate C40178 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric power advocate
Context triple: [Sir Adam Beck, instanceOf, hydroelectric power advocate]
  • A. hydropower authority
    A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
  • B. hydroelectric power project proposal
    A hydroelectric power project proposal is a formal document outlining the technical, environmental, financial, and regulatory plans for developing a facility that generates electricity from flowing or falling water.
  • C. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • D. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • E. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f8cca8819099836916c56b7c95 completed April 10, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:21 a.m.