Triple

T17946551
Position Surface form Disambiguated ID Type / Status
Subject Sea World Plaza E448716 entity
Predicate transport P230 FINISHED
Object Shekou Line of Shenzhen Metro NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shekou Line of Shenzhen Metro | Statement: [Sea World Plaza, transport, Shekou Line of Shenzhen Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shekou Line of Shenzhen Metro
Context triple: [Sea World Plaza, transport, Shekou Line of Shenzhen Metro]
  • A. Shenzhen Metro Line 2
    Shenzhen Metro Line 2 is a major east–west rapid transit line in Shenzhen’s metro system, connecting key residential, commercial, and high-tech areas including Nanshan District.
  • B. Shenzhen Metro Line 11
    Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
  • C. Shenzhen Metro Line 10
    Shenzhen Metro Line 10 is a rapid transit line in Shenzhen’s metro system that serves key residential and commercial districts and connects with multiple other lines to facilitate cross-city travel.
  • D. Shenzhen Metro Line 5
    Shenzhen Metro Line 5 is a major orbital rapid transit line in Shenzhen’s metro system, connecting multiple districts across the city and easing east–west urban travel.
  • E. Shenzhen Metro Line 1
    Shenzhen Metro Line 1 is a major rapid transit line in Shenzhen’s metro system, running east–west across key districts and serving as one of the city’s primary urban transport corridors.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Shekou Line of Shenzhen Metro
Target entity description: The Shekou Line of the Shenzhen Metro is a major urban rapid transit line serving key commercial, residential, and tourist areas in Shenzhen, China.
  • A. Shenzhen Metro Line 2
    Shenzhen Metro Line 2 is a major east–west rapid transit line in Shenzhen’s metro system, connecting key residential, commercial, and high-tech areas including Nanshan District.
  • B. Shenzhen Metro Line 11
    Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
  • C. Shenzhen Metro Line 10
    Shenzhen Metro Line 10 is a rapid transit line in Shenzhen’s metro system that serves key residential and commercial districts and connects with multiple other lines to facilitate cross-city travel.
  • D. Shenzhen Metro Line 5
    Shenzhen Metro Line 5 is a major orbital rapid transit line in Shenzhen’s metro system, connecting multiple districts across the city and easing east–west urban travel.
  • E. Shenzhen Metro Line 1
    Shenzhen Metro Line 1 is a major rapid transit line in Shenzhen’s metro system, running east–west across key districts and serving as one of the city’s primary urban transport corridors.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f8cca8819099836916c56b7c95 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4ad99df408190a8a4e3d21c03fe71 completed April 19, 2026, 10:25 a.m.
Created at: April 10, 2026, 10:21 a.m.