Triple

T17933878
Position Surface form Disambiguated ID Type / Status
Subject South West Main Line (London Waterloo to Basingstoke) E448401 entity
Predicate lineNumber P1864 FINISHED
Object SWML NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SWML | Statement: [South West Main Line (London Waterloo to Basingstoke), lineNumber, SWML]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SWML
Context triple: [South West Main Line (London Waterloo to Basingstoke), lineNumber, SWML]
  • A. SWM
    SWM is the municipal utility company of Munich, Germany, responsible for providing services such as energy, water, and public transportation.
  • B. WAML
    WAML is the ICAO airport code for Mutiara SIS Al-Jufrie Airport in Palu, Central Sulawesi, Indonesia.
  • C. SWMP
    SWMP (System-Wide Monitoring Program) is a long-term environmental monitoring initiative that tracks water quality, weather, and ecological conditions across the National Estuarine Research Reserve System.
  • D. SWB
    SWB is the commonly used abbreviation for Southwestern Bell, a major former regional telephone company in the United States that became part of AT&T.
  • E. WLM
    WLM (Workload Manager) is an IBM z/OS component that dynamically manages and prioritizes system workloads to meet performance goals and service-level objectives.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SWML
Target entity description: SWML is a major British railway route designation referring to the South West Main Line running from London Waterloo towards southwest England.
  • A. SWM
    SWM is the municipal utility company of Munich, Germany, responsible for providing services such as energy, water, and public transportation.
  • B. WAML
    WAML is the ICAO airport code for Mutiara SIS Al-Jufrie Airport in Palu, Central Sulawesi, Indonesia.
  • C. SWMP
    SWMP (System-Wide Monitoring Program) is a long-term environmental monitoring initiative that tracks water quality, weather, and ecological conditions across the National Estuarine Research Reserve System.
  • D. SWB
    SWB is the commonly used abbreviation for Southwestern Bell, a major former regional telephone company in the United States that became part of AT&T.
  • E. WLM
    WLM (Workload Manager) is an IBM z/OS component that dynamically manages and prioritizes system workloads to meet performance goals and service-level objectives.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f79d14819095540856928f0e25 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a5547b7881909dc41bb7dd34194f completed April 19, 2026, 9:50 a.m.
Created at: April 10, 2026, 10:21 a.m.