Triple

T17933680
Position Surface form Disambiguated ID Type / Status
Subject Axminster railway station E448397 entity
Predicate fareZone P844 FINISHED
Object National Rail zoneless system NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Rail zoneless system | Statement: [Axminster railway station, fareZone, National Rail zoneless system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Rail zoneless system
Context triple: [Axminster railway station, fareZone, National Rail zoneless system]
  • A. National Rail
    National Rail is the collective name for the passenger rail services and network in Great Britain, encompassing most regional and intercity train operations outside of urban metro systems.
  • B. National Rail smartcard schemes
    National Rail smartcard schemes are contactless, interoperable ticketing systems used across much of Britain’s rail network to allow passengers to store and use train tickets electronically on smartcards.
  • C. National Rail Enquiries
    National Rail Enquiries is the official information service for Britain’s National Rail network, providing timetables, fares, and real-time journey updates to passengers.
  • D. Network Rail
    Network Rail is the owner and infrastructure manager of most of the railway network in Great Britain, responsible for tracks, signals, major stations, and related assets.
  • E. Randstad regional rail network
    The Randstad regional rail network is a Dutch commuter and regional rail system serving the densely populated Randstad metropolitan area, connecting major cities such as Amsterdam, Rotterdam, The Hague, and Utrecht with surrounding towns.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: National Rail zoneless system
Target entity description: The National Rail zoneless system is the nationwide fare structure used across most of Britain’s mainline rail network, where ticket prices are calculated by point-to-point distance rather than by travel zones.
  • A. National Rail
    National Rail is the collective name for the passenger rail services and network in Great Britain, encompassing most regional and intercity train operations outside of urban metro systems.
  • B. National Rail smartcard schemes
    National Rail smartcard schemes are contactless, interoperable ticketing systems used across much of Britain’s rail network to allow passengers to store and use train tickets electronically on smartcards.
  • C. National Rail Enquiries
    National Rail Enquiries is the official information service for Britain’s National Rail network, providing timetables, fares, and real-time journey updates to passengers.
  • D. Network Rail
    Network Rail is the owner and infrastructure manager of most of the railway network in Great Britain, responsible for tracks, signals, major stations, and related assets.
  • E. Randstad regional rail network
    The Randstad regional rail network is a Dutch commuter and regional rail system serving the densely populated Randstad metropolitan area, connecting major cities such as Amsterdam, Rotterdam, The Hague, and Utrecht with surrounding towns.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f79d14819095540856928f0e25 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a5547b7881909dc41bb7dd34194f completed April 19, 2026, 9:50 a.m.
Created at: April 10, 2026, 10:21 a.m.