Triple

T17921405
Position Surface form Disambiguated ID Type / Status
Subject Plaza Bolívar E448075 entity
Predicate inTimeZone P109 FINISHED
Object Peru Time NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Peru Time | Statement: [Plaza Bolívar, inTimeZone, Peru Time]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Peru Time
Context triple: [Plaza Bolívar, inTimeZone, Peru Time]
  • A. Peru Time chosen
    Peru Time is the standard time zone used throughout Peru, corresponding to UTC−05:00 without daylight saving time.
  • B. Ecuador Time
    Ecuador Time is the standard time zone used in mainland Ecuador, including cities such as Guayaquil, typically corresponding to UTC−05:00.
  • C. Bolivia Time
    Bolivia Time is the standard time zone used throughout Bolivia, corresponding to UTC−4 with no daylight saving time.
  • D. Chile Standard Time
    Chile Standard Time is the primary time zone used in central Chile, including regions such as Coquimbo, typically set at UTC−4 hours.
  • E. Chile Summer Time
    Chile Summer Time is the daylight saving time period used in Chile, during which clocks are advanced one hour to provide extended evening daylight compared to standard time.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f6d394819082a6d69fd1e23d2f completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a30a11748190be41361d108aee58 completed April 19, 2026, 9:40 a.m.
Created at: April 10, 2026, 10:20 a.m.