Triple

T17917406
Position Surface form Disambiguated ID Type / Status
Subject Pearl Harbor Memorial Bridge E447967 entity
Predicate maintainedBy P86 FINISHED
Object CTDOT NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CTDOT | Statement: [Pearl Harbor Memorial Bridge, maintainedBy, CTDOT]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CTDOT
Context triple: [Pearl Harbor Memorial Bridge, maintainedBy, CTDOT]
  • A. CTDOT chosen
    CTDOT is the state agency responsible for planning, building, and maintaining Connecticut’s transportation infrastructure, including highways, public transit, rail, and bridges.
  • B. CDOT
    CDOT is the municipal agency responsible for planning, building, and maintaining Chicago’s transportation infrastructure, including streets, sidewalks, and traffic systems.
  • C. CDOT
    CDOT is the Connecticut Department of Transportation, the state agency responsible for overseeing and operating Connecticut’s transportation infrastructure and services, including rail operations.
  • D. CDOT
    CDOT is the state agency responsible for planning, building, and maintaining Colorado’s transportation infrastructure, including highways, bridges, and transit systems.
  • E. TDOT
    TDOT is the state agency responsible for planning, building, and maintaining Tennessee’s transportation infrastructure, including highways, bridges, and public transit systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f6d394819082a6d69fd1e23d2f completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a30778fc81908b5b2e308fb158a5 completed April 19, 2026, 9:40 a.m.
Created at: April 10, 2026, 10:20 a.m.