Triple

T17917183
Position Surface form Disambiguated ID Type / Status
Subject Lozoya River E447961 entity
Predicate hasReservoir P1025 FINISHED
Object El Atazar Reservoir NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: El Atazar Reservoir | Statement: [Lozoya River, hasReservoir, El Atazar Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: El Atazar Reservoir
Context triple: [Lozoya River, hasReservoir, El Atazar Reservoir]
  • A. Burguillo Reservoir
    Burguillo Reservoir is a major artificial lake and dam in central Spain, known for regulating water from the Alberche River and serving as a popular site for recreation and hydroelectric power.
  • B. Itoiz Reservoir
    Itoiz Reservoir is a large artificial lake in Navarre, northern Spain, created by damming the Irati River to provide water supply, irrigation, and hydroelectric power within the Ebro basin.
  • C. Pilarcitos Reservoir
    Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
  • D. Ribarroja Reservoir
    Ribarroja Reservoir is a large artificial lake on the Ebro River in northeastern Spain, used primarily for hydroelectric power generation, irrigation, and water regulation.
  • E. Ullíbarri-Gamboa Reservoir
    Ullíbarri-Gamboa Reservoir is a large artificial lake in Álava, Spain, known for supplying drinking water to Vitoria-Gasteiz and Bilbao and for its popular recreational activities and natural surroundings.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: El Atazar Reservoir
Target entity description: El Atazar Reservoir is a major water storage and supply reservoir in the Community of Madrid, Spain, known for its large capacity and role in providing drinking water to the region.
  • A. Burguillo Reservoir
    Burguillo Reservoir is a major artificial lake and dam in central Spain, known for regulating water from the Alberche River and serving as a popular site for recreation and hydroelectric power.
  • B. Itoiz Reservoir
    Itoiz Reservoir is a large artificial lake in Navarre, northern Spain, created by damming the Irati River to provide water supply, irrigation, and hydroelectric power within the Ebro basin.
  • C. Pilarcitos Reservoir
    Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
  • D. Ribarroja Reservoir
    Ribarroja Reservoir is a large artificial lake on the Ebro River in northeastern Spain, used primarily for hydroelectric power generation, irrigation, and water regulation.
  • E. Ullíbarri-Gamboa Reservoir
    Ullíbarri-Gamboa Reservoir is a large artificial lake in Álava, Spain, known for supplying drinking water to Vitoria-Gasteiz and Bilbao and for its popular recreational activities and natural surroundings.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f6d394819082a6d69fd1e23d2f completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a30778fc81908b5b2e308fb158a5 completed April 19, 2026, 9:40 a.m.
Created at: April 10, 2026, 10:20 a.m.