Triple

T17912654
Position Surface form Disambiguated ID Type / Status
Subject Parallax E447850 entity
Predicate imprisonedIn P6022 FINISHED
Object Central Power Battery of Oa NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Power Battery of Oa | Statement: [Parallax, imprisonedIn, Central Power Battery of Oa]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Power Battery of Oa
Context triple: [Parallax, imprisonedIn, Central Power Battery of Oa]
  • A. Constitution Island batteries
    The Constitution Island batteries were a series of fortified gun emplacements on Constitution Island in the Hudson River, built to help protect the strategic Hudson Highlands during the American Revolutionary War.
  • B. Battery Hearn
    Battery Hearn is a historic coastal artillery battery on Corregidor Island in the Philippines, notable for its large seacoast gun and role in World War II defenses of Manila Bay.
  • C. Alexandra Battery
    Alexandra Battery is a historic coastal artillery fortification in St. George’s, Bermuda, built to defend the island’s eastern approaches.
  • D. Nimbus Powerplant
    Nimbus Powerplant is a hydroelectric generating facility associated with California’s Nimbus Dam on the American River, producing renewable electricity from controlled water releases.
  • E. Argyle Battery
    Argyle Battery is a historic artillery fortification and prominent defensive platform forming part of Edinburgh Castle in Scotland.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Central Power Battery of Oa
Target entity description: The Central Power Battery of Oa is the immense, planet-based energy reservoir that powers the Green Lantern Corps’ rings and serves as the focal point of the emotional spectrum’s green light of willpower.
  • A. Constitution Island batteries
    The Constitution Island batteries were a series of fortified gun emplacements on Constitution Island in the Hudson River, built to help protect the strategic Hudson Highlands during the American Revolutionary War.
  • B. Battery Hearn
    Battery Hearn is a historic coastal artillery battery on Corregidor Island in the Philippines, notable for its large seacoast gun and role in World War II defenses of Manila Bay.
  • C. Alexandra Battery
    Alexandra Battery is a historic coastal artillery fortification in St. George’s, Bermuda, built to defend the island’s eastern approaches.
  • D. Nimbus Powerplant
    Nimbus Powerplant is a hydroelectric generating facility associated with California’s Nimbus Dam on the American River, producing renewable electricity from controlled water releases.
  • E. Argyle Battery
    Argyle Battery is a historic artillery fortification and prominent defensive platform forming part of Edinburgh Castle in Scotland.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f6d394819082a6d69fd1e23d2f completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e4a30288ac8190bc633e69447709bf completed April 19, 2026, 9:40 a.m.
Created at: April 10, 2026, 10:19 a.m.