Triple
T17894983
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fiat Ferroviaria |
E447408
|
entity |
| Predicate | notableProduct |
P1448
|
FINISHED |
| Object | ETR 500 power car |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ETR 500 power car | Statement: [Fiat Ferroviaria, notableProduct, ETR 500 power car]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ETR 500 power car Context triple: [Fiat Ferroviaria, notableProduct, ETR 500 power car]
-
A.
ETR 500
chosen
ETR 500 is Italy’s high-speed electric train series designed for fast intercity services on the country’s dedicated high-speed rail network.
-
B.
ETR 700
ETR 700 is a class of high-speed electric multiple unit trains operated by Trenitalia for intercity and Frecciarossa services in Italy.
-
C.
ETR 600
The ETR 600 is a class of Italian high-speed tilting electric multiple unit trains used for fast intercity and international services.
-
D.
DE30AC locomotive
The DE30AC locomotive is a diesel-electric passenger locomotive built by EMD for the Long Island Rail Road, designed for push-pull commuter service with head-end power.
-
E.
CP Class 3400 EMU
The CP Class 3400 EMU is a series of electric multiple-unit trains operated by Comboios de Portugal, primarily used for suburban and commuter rail services.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f59bd48190a6fc925a855b8bac |
completed | April 10, 2026, 8:51 a.m. |
| NER | Named-entity recognition | batch_69e49d7eb4f48190951e26975b57873b |
completed | April 19, 2026, 9:16 a.m. |
Created at: April 10, 2026, 10:19 a.m.