Triple
T17894981
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fiat Ferroviaria |
E447408
|
entity |
| Predicate | notableProduct |
P1448
|
FINISHED |
| Object | ETR 450 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ETR 450 | Statement: [Fiat Ferroviaria, notableProduct, ETR 450]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ETR 450 Context triple: [Fiat Ferroviaria, notableProduct, ETR 450]
-
A.
ETR 450
chosen
The ETR 450 is an Italian high-speed tilting trainset introduced in the late 1980s for Trenitalia’s Eurostar services, notable as one of the first production Pendolino trains.
-
B.
ETR 460
ETR 460 is an Italian high-speed tilting trainset used primarily for fast intercity passenger services.
-
C.
ETR 470
ETR 470 is an Italian-designed high-speed tilting electric multiple unit train used primarily for international EuroCity services in Europe.
-
D.
ETR 500
ETR 500 is Italy’s high-speed electric train series designed for fast intercity services on the country’s dedicated high-speed rail network.
-
E.
ETR 700
ETR 700 is a class of high-speed electric multiple unit trains operated by Trenitalia for intercity and Frecciarossa services in Italy.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f59bd48190a6fc925a855b8bac |
completed | April 10, 2026, 8:51 a.m. |
| NER | Named-entity recognition | batch_69e49d7eb4f48190951e26975b57873b |
completed | April 19, 2026, 9:16 a.m. |
Created at: April 10, 2026, 10:19 a.m.