Triple
T17889089
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Canada Gate |
E447267
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wrought iron gate |
C22800
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wrought iron gate Context triple: [Canada Gate, instanceOf, wrought iron gate]
-
A.
entrance gate
chosen
An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
-
B.
wrought-iron bridge
A wrought-iron bridge is a structure for spanning physical obstacles, such as rivers or roads, whose primary load-bearing elements are made from wrought iron, valued historically for its toughness, malleability, and resistance to fatigue.
-
C.
wrought-iron and glass structure
A wrought-iron and glass structure is an architectural framework that uses forged iron elements to support expansive glass surfaces, creating strong yet visually light enclosures that maximize transparency and natural light.
-
D.
medieval city gate
A medieval city gate is a fortified architectural structure that controls access to a walled town or city, combining defensive features like towers and portcullises with symbolic and administrative functions.
-
E.
ancient city gate
An ancient city gate is a monumental architectural structure that controlled access to a fortified settlement, often serving defensive, ceremonial, and administrative functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f59bd48190a6fc925a855b8bac |
completed | April 10, 2026, 8:51 a.m. |
Created at: April 10, 2026, 10:18 a.m.