Triple

T17876122
Position Surface form Disambiguated ID Type / Status
Subject CO 45 E446958 entity
Predicate abbreviation P43 FINISHED
Object State Highway 45 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Highway 45 | Statement: [CO 45, abbreviation, State Highway 45]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Highway 45
Context triple: [CO 45, abbreviation, State Highway 45]
  • A. State Highway 45 chosen
    State Highway 45 is a state-maintained roadway in Colorado that serves as a key connector route within the city of Pueblo.
  • B. State Highway 45
    State Highway 45 is a coastal New Zealand state highway in the Taranaki Region, known for linking New Plymouth with towns around the western side of Mount Taranaki.
  • C. State Highway 45
    State Highway 45 is a roadway designated as part of a state-maintained highway system, serving as a regional transportation route within its state.
  • D. Federal Highway 45
    Federal Highway 45 is a major Mexican federal roadway that runs north–south through central and northern Mexico, connecting key cities including Chihuahua City and serving as an important commercial and transportation corridor.
  • E. Texas State Highway 45
    Texas State Highway 45 is a toll highway forming part of the Austin area’s outer loop, helping to route traffic around the city and connect major regional roadways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e49aa614b48190bdc9e905e9e6d5e0 completed April 19, 2026, 9:04 a.m.
Created at: April 10, 2026, 10:18 a.m.