Triple

T17870597
Position Surface form Disambiguated ID Type / Status
Subject NEM New South Wales region E446824 entity
Predicate interconnector P24733 FINISHED
Object Terranora interconnector NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terranora interconnector | Statement: [NEM New South Wales region, interconnector, Terranora interconnector]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Terranora interconnector
Context triple: [NEM New South Wales region, interconnector, Terranora interconnector]
  • A. UK–continental Europe interconnector
    The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
  • B. Montalto di Castro power station
    Montalto di Castro power station is a large thermal power plant in Italy, originally planned as a nuclear facility and later converted to conventional generation.
  • C. Vizzavona tunnel
    The Vizzavona tunnel is a major railway tunnel in Corsica that carries the island’s central rail line beneath the mountainous Vizzavona Pass.
  • D. TurkStream
    TurkStream is a major natural gas pipeline system running from Russia to Turkey across the Black Sea, designed to supply gas to Turkey and Southern Europe.
  • E. Rossio–Campolide tunnel
    The Rossio–Campolide tunnel is a key railway tunnel in Lisbon, Portugal, carrying suburban and regional trains between the city center and the inland rail network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Terranora interconnector
Target entity description: The Terranora interconnector is a high-voltage transmission link that connects the New South Wales section of Australia’s National Electricity Market with the Queensland power system to facilitate cross-border electricity flows.
  • A. UK–continental Europe interconnector
    The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
  • B. Montalto di Castro power station
    Montalto di Castro power station is a large thermal power plant in Italy, originally planned as a nuclear facility and later converted to conventional generation.
  • C. Vizzavona tunnel
    The Vizzavona tunnel is a major railway tunnel in Corsica that carries the island’s central rail line beneath the mountainous Vizzavona Pass.
  • D. TurkStream
    TurkStream is a major natural gas pipeline system running from Russia to Turkey across the Black Sea, designed to supply gas to Turkey and Southern Europe.
  • E. Rossio–Campolide tunnel
    The Rossio–Campolide tunnel is a key railway tunnel in Lisbon, Portugal, carrying suburban and regional trains between the city center and the inland rail network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e49aa24c8481909de38953a88ff615 completed April 19, 2026, 9:04 a.m.
Created at: April 10, 2026, 10:18 a.m.