Triple

T17870559
Position Surface form Disambiguated ID Type / Status
Subject NEM New South Wales region E446824 entity
Predicate instanceOf P0 FINISHED
Object electricity market region C39228 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity market region
Context triple: [NEM New South Wales region, instanceOf, electricity market region]
  • A. wholesale electricity market operator
    A wholesale electricity market operator is an entity that administers and coordinates the buying and selling of electricity in bulk, ensuring efficient market functioning, system reliability, and fair access for generators and large consumers.
  • B. regional transmission organization
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • C. electricity reliability regulator
    An electricity reliability regulator is an authority responsible for setting, monitoring, and enforcing standards to ensure the continuous, safe, and dependable operation of the electric power system.
  • D. electricity interconnector
    An electricity interconnector is a high-capacity transmission link that connects the power grids of different regions or countries, enabling cross-border exchange of electrical energy.
  • E. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:18 a.m.