Triple

T17870508
Position Surface form Disambiguated ID Type / Status
Subject National Electricity Market E446823 entity
Predicate instanceOf P0 FINISHED
Object wholesale electricity market C27230 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wholesale electricity market
Context triple: [National Electricity Market, instanceOf, wholesale electricity market]
  • A. wholesale electricity market operator
    A wholesale electricity market operator is an entity that administers and coordinates the buying and selling of electricity in bulk, ensuring efficient market functioning, system reliability, and fair access for generators and large consumers.
  • B. wholesale energy company
    A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
  • C. regional transmission organization chosen
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • D. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • E. electricity industry association
    An electricity industry association is an organized group that represents and advocates for the collective interests of companies and stakeholders involved in the generation, transmission, distribution, and sale of electric power.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f4c22c819093c2680434472894 completed April 10, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:18 a.m.