Triple

T17859186
Position Surface form Disambiguated ID Type / Status
Subject Washington Metro Silver Line E446020 entity
Predicate phase2Opened P40333 FINISHED
Object 2022-11-15 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2022-11-15 | Statement: [Washington Metro Silver Line, phase2Opened, 2022-11-15]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: phase2Opened
Context triple: [Washington Metro Silver Line, phase2Opened, 2022-11-15]
  • A. phase1OpeningDate
    Indicates the date on which the first phase of a project, development, or initiative is officially opened or begins operation.
  • B. openingDatePhase2 chosen
    Indicates the date on which the second phase of a project, process, or facility is scheduled to begin or officially open.
  • C. phase2Purpose
    Indicates the specific intended goal, function, or outcome associated with the second phase of a process or project.
  • D. phasedOpening
    Indicates that the opening or launch of something occurs in multiple planned stages or phases rather than all at once.
  • E. secondPhase
    Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f26f18819089c9e43250bee6ae completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4978e68ec8190a4306f7b7bb058d7 completed April 19, 2026, 8:51 a.m.
PD Predicate disambiguation batch_69e3d8e6d2e88190ad9ef9f8a99f13e6 completed April 18, 2026, 7:17 p.m.
Created at: April 10, 2026, 10:17 a.m.