Triple

T17857274
Position Surface form Disambiguated ID Type / Status
Subject Khanewal E445973 entity
Predicate locatedOn P40 FINISHED
Object Multan–Khanewal Road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Multan–Khanewal Road | Statement: [Khanewal, locatedOn, Multan–Khanewal Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Multan–Khanewal Road
Context triple: [Khanewal, locatedOn, Multan–Khanewal Road]
  • A. Lahore–Jhang road
    The Lahore–Jhang road is a significant regional highway in Pakistan that connects the city of Lahore with Jhang, passing through towns such as Rabwah.
  • B. Multan–Bahawalpur road corridor
    The Multan–Bahawalpur road corridor is a major regional highway link in southern Punjab, Pakistan, connecting key urban centers and facilitating trade and travel between Multan and Bahawalpur.
  • C. Hasilpur–Bahawalpur Road
    Hasilpur–Bahawalpur Road is a regional roadway in Punjab, Pakistan, that connects the town of Hasilpur with the city of Bahawalpur and serves as an important local transport route.
  • D. Peshawar–Charsadda Road
    Peshawar–Charsadda Road is a major regional roadway in Khyber Pakhtunkhwa, Pakistan, linking the city of Peshawar with the nearby town of Charsadda and serving as an important commuter and trade route.
  • E. Mardan–Swabi Road
    Mardan–Swabi Road is a key regional roadway in Khyber Pakhtunkhwa, Pakistan, connecting the cities of Mardan and Swabi and facilitating local trade and travel.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Multan–Khanewal Road
Target entity description: Multan–Khanewal Road is a major intercity roadway in Punjab, Pakistan, connecting the cities of Multan and Khanewal and serving as an important regional transport route.
  • A. Lahore–Jhang road
    The Lahore–Jhang road is a significant regional highway in Pakistan that connects the city of Lahore with Jhang, passing through towns such as Rabwah.
  • B. Multan–Bahawalpur road corridor
    The Multan–Bahawalpur road corridor is a major regional highway link in southern Punjab, Pakistan, connecting key urban centers and facilitating trade and travel between Multan and Bahawalpur.
  • C. Hasilpur–Bahawalpur Road
    Hasilpur–Bahawalpur Road is a regional roadway in Punjab, Pakistan, that connects the town of Hasilpur with the city of Bahawalpur and serves as an important local transport route.
  • D. Peshawar–Charsadda Road
    Peshawar–Charsadda Road is a major regional roadway in Khyber Pakhtunkhwa, Pakistan, linking the city of Peshawar with the nearby town of Charsadda and serving as an important commuter and trade route.
  • E. Mardan–Swabi Road
    Mardan–Swabi Road is a key regional roadway in Khyber Pakhtunkhwa, Pakistan, connecting the cities of Mardan and Swabi and facilitating local trade and travel.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f26f18819089c9e43250bee6ae completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4978d05708190838386d37eb157bc completed April 19, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:17 a.m.