Triple
T1785147
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Otis Elevator Company |
E39374
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | escalator manufacturer |
C5242
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: escalator manufacturer Context triple: [Otis Elevator Company, instanceOf, escalator manufacturer]
-
A.
elevator
An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
-
B.
amusement ride manufacturer
An amusement ride manufacturer is a company or entity that designs, engineers, constructs, and often installs mechanical attractions such as roller coasters, carousels, and other rides for amusement parks and entertainment venues.
-
C.
staircase
A staircase is a series of fixed steps that provide a means of moving between different vertical levels in a building or structure.
-
D.
elevated walkway
An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
-
E.
manufacturer
chosen
A manufacturer is an entity that produces goods from raw materials or components, typically using machinery and labor, to supply products for distribution and sale.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88630519c8190a17addd83c4a3ef4 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:31 p.m.