Triple

T1785144
Position Surface form Disambiguated ID Type / Status
Subject Carrier Global Corporation E39373 entity
Predicate instanceOf P0 FINISHED
Object HVAC and refrigeration company C136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: HVAC and refrigeration company
Context triple: [Carrier Global Corporation, instanceOf, HVAC and refrigeration company]
  • A. manufacturing company chosen
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • B. Consumer electronics company
    A consumer electronics company is a business that designs, manufactures, markets, and sells electronic devices and gadgets for everyday personal and household use.
  • C. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • D. multinational utility company
    A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
  • E. automotive services company
    An automotive services company is a business that provides maintenance, repair, inspection, and related support services for vehicles to ensure their safety, reliability, and performance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88630519c8190a17addd83c4a3ef4 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:31 p.m.