Triple
T1785143
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Otis Worldwide Corporation |
E39373
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevator and escalator company |
C8468
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevator and escalator company Context triple: [Otis Worldwide Corporation, instanceOf, elevator and escalator company]
-
A.
elevator
An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
-
B.
amusement ride manufacturer
An amusement ride manufacturer is a company or entity that designs, engineers, constructs, and often installs mechanical attractions such as roller coasters, carousels, and other rides for amusement parks and entertainment venues.
-
C.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
D.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
-
E.
elevator code
Elevator code is the software logic and control system that manages an elevator’s movement, door operations, safety checks, and user requests within a building.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88630519c8190a17addd83c4a3ef4 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:31 p.m.