Triple
T17847123
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TGV R |
E445692
|
entity |
| Predicate | electrificationCompatibility |
P129395
|
FINISHED |
| Object | French AC high-voltage systems |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: French AC high-voltage systems | Statement: [TGV R, electrificationCompatibility, French AC high-voltage systems]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electrificationCompatibility Context triple: [TGV R, electrificationCompatibility, French AC high-voltage systems]
-
A.
electrificationUsedBy
Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
-
B.
electrificationSystem
Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
-
C.
hasElectrificationStatus
Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
-
D.
electrificationUsedFor
Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
-
E.
electrificationYear
Indicates the year in which something (such as a system, facility, or infrastructure) was converted to or equipped for electric power.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f26f18819089c9e43250bee6ae |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e48ffb35248190a80a428686e06d87 |
completed | April 19, 2026, 8:19 a.m. |
| PD | Predicate disambiguation | batch_69e3d8e266888190ae976b4b7d5b886f |
completed | April 18, 2026, 7:17 p.m. |
| PDg | Predicate description generation | batch_69e3f022ec448190a9bf191be1c5f570 |
completed | April 18, 2026, 8:57 p.m. |
Created at: April 10, 2026, 10:16 a.m.