Triple

T17829966
Position Surface form Disambiguated ID Type / Status
Subject Green Line (Chennai Metro) E445224 entity
Predicate partOfNetwork P840 FINISHED
Object Phase I of Chennai Metro NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Phase I of Chennai Metro | Statement: [Green Line (Chennai Metro), partOfNetwork, Phase I of Chennai Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Phase I of Chennai Metro
Context triple: [Green Line (Chennai Metro), partOfNetwork, Phase I of Chennai Metro]
  • A. Chennai Metro
    Chennai Metro is a rapid transit system serving the Indian city of Chennai, providing urban rail connectivity across key residential, commercial, and industrial areas.
  • B. Chennai Central Metro
    Chennai Central Metro is a major underground interchange station in Chennai, India, connecting the Chennai Metro network with the city’s primary railway terminus and other urban transit services.
  • C. Chennai MRTS
    Chennai MRTS is an elevated suburban railway network in Chennai, India, providing rapid transit services along key urban corridors and connecting with other city transport systems.
  • D. Hyderabad Metro
    Hyderabad Metro is a rapid transit system serving the city of Hyderabad, India, featuring multiple elevated corridors designed to ease urban traffic congestion and improve public transportation.
  • E. Bangalore Metro
    Bangalore Metro is a rapid transit system serving the city of Bengaluru, India, providing an elevated and underground rail network to ease urban transportation and reduce traffic congestion.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Phase I of Chennai Metro
Target entity description: Phase I of Chennai Metro is the initial development stage of Chennai’s rapid transit system, comprising the first set of operational corridors and infrastructure built to introduce metro rail service to the city.
  • A. Chennai Metro chosen
    Chennai Metro is a rapid transit system serving the Indian city of Chennai, providing urban rail connectivity across key residential, commercial, and industrial areas.
  • B. Chennai Central Metro
    Chennai Central Metro is a major underground interchange station in Chennai, India, connecting the Chennai Metro network with the city’s primary railway terminus and other urban transit services.
  • C. Chennai MRTS
    Chennai MRTS is an elevated suburban railway network in Chennai, India, providing rapid transit services along key urban corridors and connecting with other city transport systems.
  • D. Hyderabad Metro
    Hyderabad Metro is a rapid transit system serving the city of Hyderabad, India, featuring multiple elevated corridors designed to ease urban traffic congestion and improve public transportation.
  • E. Bangalore Metro
    Bangalore Metro is a rapid transit system serving the city of Bengaluru, India, providing an elevated and underground rail network to ease urban transportation and reduce traffic congestion.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f1a6d881909f024bc603111cdb completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48917c4d88190b919a4b75aed011c completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.