Triple

T17827944
Position Surface form Disambiguated ID Type / Status
Subject Junkers Ju 287 E445171 entity
Predicate instanceOf P0 FINISHED
Object experimental jet bomber C22947 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental jet bomber
Context triple: [Junkers Ju 287, instanceOf, experimental jet bomber]
  • A. experimental aircraft
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. prototype bomber aircraft chosen
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • C. jet-powered aircraft
    A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
  • D. jet-powered medium bomber
    A jet-powered medium bomber is a military aircraft designed to deliver moderate payloads of bombs or missiles over medium ranges at high subsonic or supersonic speeds, balancing striking power, range, and maneuverability.
  • E. high‑speed bomber
    A high-speed bomber is a military aircraft designed to deliver ordnance to targets while relying primarily on superior speed and altitude to penetrate enemy defenses and evade interception.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f1a6d881909f024bc603111cdb completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:15 a.m.