Triple

T17823675
Position Surface form Disambiguated ID Type / Status
Subject Shenzhen Metro Line 7 E445055 entity
Predicate isPartOf P10 FINISHED
Object Shenzhen urban rail network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shenzhen urban rail network | Statement: [Shenzhen Metro Line 7, isPartOf, Shenzhen urban rail network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Shenzhen urban rail network
Context triple: [Shenzhen Metro Line 7, isPartOf, Shenzhen urban rail network]
  • A. Shenzhen Metro
    Shenzhen Metro is the rapid transit system serving the city of Shenzhen, China, known for its extensive, modern network and role in supporting the region’s fast-paced urban development.
  • B. Shenzhen Metro Line 11
    Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
  • C. Shenzhen Metro Line 16
    Shenzhen Metro Line 16 is a rapid transit line in the Shenzhen Metro system serving the Longgang area and surrounding districts in Shenzhen, China.
  • D. Shenzhen Metro Line 12
    Shenzhen Metro Line 12 is an urban rapid transit line in Shenzhen, China, forming part of the Shenzhen Metro network and connecting several districts including the Shekou area.
  • E. Pearl River Delta intercity rail network
    The Pearl River Delta intercity rail network is a high-speed regional rail system in southern China that links major cities across the Greater Bay Area, including Guangzhou, Shenzhen, Foshan, and surrounding urban centers.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Shenzhen urban rail network
Target entity description: The Shenzhen urban rail network is an extensive rapid transit system serving the city of Shenzhen, China, connecting major residential, commercial, and industrial areas with high-frequency metro services.
  • A. Shenzhen Metro chosen
    Shenzhen Metro is the rapid transit system serving the city of Shenzhen, China, known for its extensive, modern network and role in supporting the region’s fast-paced urban development.
  • B. Shenzhen Metro Line 11
    Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
  • C. Shenzhen Metro Line 16
    Shenzhen Metro Line 16 is a rapid transit line in the Shenzhen Metro system serving the Longgang area and surrounding districts in Shenzhen, China.
  • D. Shenzhen Metro Line 12
    Shenzhen Metro Line 12 is an urban rapid transit line in Shenzhen, China, forming part of the Shenzhen Metro network and connecting several districts including the Shekou area.
  • E. Pearl River Delta intercity rail network
    The Pearl River Delta intercity rail network is a high-speed regional rail system in southern China that links major cities across the Greater Bay Area, including Guangzhou, Shenzhen, Foshan, and surrounding urban centers.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4891282a081908d384d45bf444baf completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.