Triple
T17823433
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Loch nEathach |
E445046
|
entity |
| Predicate | inflow |
P415
|
FINISHED |
| Object | Ballinderry River |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ballinderry River | Statement: [Loch nEathach, inflow, Ballinderry River]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ballinderry River Context triple: [Loch nEathach, inflow, Ballinderry River]
-
A.
Ballinderry River
chosen
The Ballinderry River is a river in Northern Ireland that flows through County Tyrone and County Londonderry before reaching Lough Neagh.
-
B.
Ballynahinch River
The Ballynahinch River is a small river in County Down, Northern Ireland, that flows through the town of Ballynahinch and contributes to the local drainage and landscape of the area.
-
C.
Owenmore River
The Owenmore River is a waterway in Ireland that serves as one of the main rivers feeding into Lough Allen in the upper River Shannon system.
-
D.
River Addergoole
River Addergoole is a river in County Mayo, Ireland, that drains part of the surrounding landscape and contributes its waters to Lough Conn.
-
E.
River Stoneyford
River Stoneyford is a minor river in Ireland that serves as one of the tributaries feeding into the River Boyne.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f0de78819099395b14db75a8a6 |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e4891282a081908d384d45bf444baf |
completed | April 19, 2026, 7:49 a.m. |
Created at: April 10, 2026, 10:15 a.m.