Triple

T17820059
Position Surface form Disambiguated ID Type / Status
Subject Green Line (Namma Metro) E444957 entity
Predicate hasStation P35 FINISHED
Object Kuvempu Road metro station NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kuvempu Road metro station | Statement: [Green Line (Namma Metro), hasStation, Kuvempu Road metro station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kuvempu Road metro station
Context triple: [Green Line (Namma Metro), hasStation, Kuvempu Road metro station]
  • A. Uppal metro station
    Uppal metro station is an elevated station on the Hyderabad Metro network serving the Uppal area in Hyderabad, India.
  • B. Karunamoyee metro station
    Karunamoyee metro station is an elevated station on Kolkata Metro’s East-West corridor serving the Karunamoyee area of Salt Lake City (Bidhannagar) in West Bengal, India.
  • C. Mahalakshmi metro station chosen
    Mahalakshmi metro station is an elevated station on Bengaluru’s Namma Metro system serving the Green Line corridor.
  • D. Nagasandra metro station
    Nagasandra metro station is an elevated station in northwest Bengaluru serving as the northern endpoint of the Namma Metro’s Green Line.
  • E. Halasuru Metro Station
    Halasuru Metro Station is an elevated Namma Metro station on Bengaluru’s Purple Line serving the Halasuru/Ulsoor area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e489101aa48190a1439d8cb683bba9 completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.