Triple

T17820058
Position Surface form Disambiguated ID Type / Status
Subject Green Line (Namma Metro) E444957 entity
Predicate hasStation P35 FINISHED
Object Rajajinagar metro station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rajajinagar metro station | Statement: [Green Line (Namma Metro), hasStation, Rajajinagar metro station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rajajinagar metro station
Context triple: [Green Line (Namma Metro), hasStation, Rajajinagar metro station]
  • A. Jayanagar metro station
    Jayanagar metro station is an elevated Namma Metro station on the Green Line serving the Jayanagar neighborhood in Bengaluru, India.
  • B. Nadaprabhu Kempegowda Metro Station
    Nadaprabhu Kempegowda Metro Station is a major interchange and transit hub in Bengaluru’s Namma Metro network, connecting multiple lines and serving as one of the city’s busiest urban rail stations.
  • C. Byappanahalli metro station
    Byappanahalli metro station is a major terminal and interchange station on Bengaluru’s Namma Metro network, serving as a key transit hub in the eastern part of the city.
  • D. Dasarahalli metro station
    Dasarahalli metro station is an elevated station on Bengaluru’s Namma Metro system serving the Dasarahalli area along the Green Line.
  • E. Jalahalli metro station
    Jalahalli metro station is an elevated station on Bengaluru’s Namma Metro network serving the Jalahalli area in the city’s northwestern region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Rajajinagar metro station
Target entity description: Rajajinagar metro station is an elevated Namma Metro station in Bengaluru serving the busy Rajajinagar locality with connectivity to key residential and commercial areas.
  • A. Jayanagar metro station
    Jayanagar metro station is an elevated Namma Metro station on the Green Line serving the Jayanagar neighborhood in Bengaluru, India.
  • B. Nadaprabhu Kempegowda Metro Station
    Nadaprabhu Kempegowda Metro Station is a major interchange and transit hub in Bengaluru’s Namma Metro network, connecting multiple lines and serving as one of the city’s busiest urban rail stations.
  • C. Byappanahalli metro station
    Byappanahalli metro station is a major terminal and interchange station on Bengaluru’s Namma Metro network, serving as a key transit hub in the eastern part of the city.
  • D. Dasarahalli metro station
    Dasarahalli metro station is an elevated station on Bengaluru’s Namma Metro system serving the Dasarahalli area along the Green Line.
  • E. Jalahalli metro station
    Jalahalli metro station is an elevated station on Bengaluru’s Namma Metro network serving the Jalahalli area in the city’s northwestern region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f0de78819099395b14db75a8a6 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e489101aa48190a1439d8cb683bba9 completed April 19, 2026, 7:49 a.m.
Created at: April 10, 2026, 10:15 a.m.