Triple
T17815565
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nam Ou 6 Dam |
E444828
|
entity |
| Predicate | associatedWith |
P37
|
FINISHED |
| Object | Nam Ou 7 Dam |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nam Ou 7 Dam | Statement: [Nam Ou 6 Dam, associatedWith, Nam Ou 7 Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Nam Ou 7 Dam Context triple: [Nam Ou 6 Dam, associatedWith, Nam Ou 7 Dam]
-
A.
Nam Ou 7 Dam
chosen
Nam Ou 7 Dam is a hydropower facility on Laos’s Nam Ou River, forming part of a multi-dam cascade developed to generate electricity and support regional energy needs.
-
B.
Nam Ou 6 Dam
Nam Ou 6 Dam is a hydropower facility on the Nam Ou River in Laos, forming part of a multi-dam cascade developed to generate electricity and support regional power supply.
-
C.
Nam Ou 5 Dam
Nam Ou 5 Dam is a hydropower facility on the Nam Ou River in Laos that forms part of a larger cascade of dams developed for electricity generation.
-
D.
Nam Ou 2 Dam
Nam Ou 2 Dam is a hydropower facility on the Nam Ou River in Laos that forms part of a larger cascade of dams developed for electricity generation.
-
E.
Nam Ou 4 Dam
Nam Ou 4 Dam is a hydropower facility on Laos’s Nam Ou River that forms part of a larger cascade of dams developed for electricity generation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f0de78819099395b14db75a8a6 |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e4887f7d048190b6d813b9f0fab3e7 |
completed | April 19, 2026, 7:47 a.m. |
Created at: April 10, 2026, 10:14 a.m.