Triple
T17812415
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metro Silver Line |
E444743
|
entity |
| Predicate | servedCorridor |
P2566
|
FINISHED |
| Object | Interstate 10 El Monte Busway corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 10 El Monte Busway corridor | Statement: [Metro Silver Line, servedCorridor, Interstate 10 El Monte Busway corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 10 El Monte Busway corridor Context triple: [Metro Silver Line, servedCorridor, Interstate 10 El Monte Busway corridor]
-
A.
I-210 Freeway
The I-210 Freeway is a major east–west highway in Southern California that runs along the foothills of the San Gabriel Mountains, serving as a key commuter and bypass route around the Los Angeles metropolitan area.
-
B.
Interstate 105 freeway
Interstate 105 is an east–west freeway in Los Angeles County that connects Los Angeles International Airport to the I-605 corridor and serves as a major commuter route through the South Bay and Gateway Cities.
-
C.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in Florida that serves as a spur route connecting downtown Pensacola to Interstate 10.
-
D.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in Louisiana that serves as a spur route into downtown Baton Rouge from Interstate 10.
-
E.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in El Paso, Texas, that connects Interstate 10 to the U.S.–Mexico border.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Interstate 10 El Monte Busway corridor Target entity description: The Interstate 10 El Monte Busway corridor is a dedicated high-occupancy and bus transit facility along Interstate 10 in the Los Angeles area that supports rapid bus services between downtown Los Angeles and communities to the east.
-
A.
I-210 Freeway
The I-210 Freeway is a major east–west highway in Southern California that runs along the foothills of the San Gabriel Mountains, serving as a key commuter and bypass route around the Los Angeles metropolitan area.
-
B.
Interstate 105 freeway
Interstate 105 is an east–west freeway in Los Angeles County that connects Los Angeles International Airport to the I-605 corridor and serves as a major commuter route through the South Bay and Gateway Cities.
-
C.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in Florida that serves as a spur route connecting downtown Pensacola to Interstate 10.
-
D.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in Louisiana that serves as a spur route into downtown Baton Rouge from Interstate 10.
-
E.
Interstate 110
Interstate 110 is a short auxiliary Interstate Highway in El Paso, Texas, that connects Interstate 10 to the U.S.–Mexico border.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9f0de78819099395b14db75a8a6 |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e4887c63608190b29a407cabff0bc5 |
completed | April 19, 2026, 7:47 a.m. |
Created at: April 10, 2026, 10:14 a.m.