Triple

T17805179
Position Surface form Disambiguated ID Type / Status
Subject Sheikh Mohammed bin Zayed Road E444537 entity
Predicate connectsTo P845 FINISHED
Object E 311 corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: E 311 corridor | Statement: [Sheikh Mohammed bin Zayed Road, connectsTo, E 311 corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: E 311 corridor
Context triple: [Sheikh Mohammed bin Zayed Road, connectsTo, E 311 corridor]
  • A. M-85 corridor
    The M-85 corridor is a major transportation route in the Detroit–Windsor region that integrates key crossings and roadways to facilitate cross-border traffic and regional connectivity.
  • B. E20 corridor
    The E20 corridor is a major trans-European railway route running through Poland that forms part of an important east–west transport link connecting Western and Eastern Europe.
  • C. E16 corridor
    The E16 corridor is a major European route and transport corridor in Norway that connects key inland regions and facilitates travel between Oslo and western Norway.
  • D. I-15 corridor
    The I-15 corridor is a major north–south interstate route in the western United States that connects Southern California with Nevada, Utah, Idaho, and Montana, serving as a key artery for regional travel and commerce.
  • E. Rand Road corridor
    The Rand Road corridor is a major suburban arterial route in the Chicago metropolitan area that serves as a key transit and commercial spine for communities northwest of the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: E 311 corridor
Target entity description: The E 311 corridor is a major highway route in the United Arab Emirates that serves as a key arterial link for regional traffic and urban development.
  • A. M-85 corridor
    The M-85 corridor is a major transportation route in the Detroit–Windsor region that integrates key crossings and roadways to facilitate cross-border traffic and regional connectivity.
  • B. E20 corridor
    The E20 corridor is a major trans-European railway route running through Poland that forms part of an important east–west transport link connecting Western and Eastern Europe.
  • C. E16 corridor
    The E16 corridor is a major European route and transport corridor in Norway that connects key inland regions and facilitates travel between Oslo and western Norway.
  • D. I-15 corridor
    The I-15 corridor is a major north–south interstate route in the western United States that connects Southern California with Nevada, Utah, Idaho, and Montana, serving as a key artery for regional travel and commerce.
  • E. Rand Road corridor
    The Rand Road corridor is a major suburban arterial route in the Chicago metropolitan area that serves as a key transit and commercial spine for communities northwest of the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9efe370819095cd219b143ae727 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4880385b48190b8dea0f05dfa1300 completed April 19, 2026, 7:45 a.m.
Created at: April 10, 2026, 10:14 a.m.