Triple
T17784246
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Truth Study Center |
E443976
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | installation-based project |
C12617
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: installation-based project Context triple: [Truth Study Center, instanceOf, installation-based project]
-
A.
installation art
chosen
Installation art is a conceptual class of site-specific, often immersive artworks that transform a space through the arrangement of objects, media, and sensory elements to create an experiential environment for viewers.
-
B.
software installation service
A software installation service is a system or component responsible for deploying, configuring, and verifying software applications on target environments according to specified requirements and constraints.
-
C.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
studio project
A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
-
E.
unit-level installation
A unit-level installation is a discrete, self-contained deployment of a system or component at the smallest operational level, typically configured and managed independently within a larger infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9ef17708190bdf7e2adbf14ddc2 |
completed | April 10, 2026, 8:50 a.m. |
Created at: April 10, 2026, 10:12 a.m.