Triple
T17782109
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | B-movies |
E443924
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | low-budget film |
C12788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: low-budget film Context triple: [B-movies, instanceOf, low-budget film]
-
A.
low-budget film scheme
A low-budget film scheme is a structured plan or program designed to finance, produce, and distribute films with minimal financial resources while maximizing creative output and cost efficiency.
-
B.
grindhouse-style film
chosen
A grindhouse-style film is a low-budget, sensationalist movie that emphasizes graphic violence, exploitation themes, and retro aesthetics reminiscent of mid-20th-century grindhouse theaters.
-
C.
mumblecore film
A mumblecore film is a low-budget, dialogue-driven movie that emphasizes naturalistic acting, improvised conversations, and the everyday emotional lives of young adults over conventional plot and polished production values.
-
D.
unproduced film
An unproduced film is a motion picture project that has been conceived and possibly developed through scripts or planning but has never progressed to full-scale production or release.
-
E.
short film spin-off
A short film spin-off is a brief, self-contained cinematic work that expands on characters, events, or themes from an existing film or series without serving as a direct sequel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9ef17708190bdf7e2adbf14ddc2 |
completed | April 10, 2026, 8:50 a.m. |
Created at: April 10, 2026, 10:12 a.m.