Triple

T17778805
Position Surface form Disambiguated ID Type / Status
Subject Toussaint L’Ouverture series E443842 entity
Predicate instanceOf P0 FINISHED
Object narrative painting cycle C35727 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: narrative painting cycle
Context triple: [Toussaint L’Ouverture series, instanceOf, narrative painting cycle]
  • A. artistic cycle chosen
    An artistic cycle is a series of related artworks, often unified by a common theme, narrative, or concept, intended to be understood as a cohesive whole.
  • B. historical novel cycle
    A historical novel cycle is a series of interrelated historical fiction works that share a common setting, characters, or overarching narrative across multiple volumes.
  • C. Nabi painting
    Nabi painting is a style of late 19th-century French art created by the Nabi group, characterized by flat areas of bold color, decorative patterns, and symbolic or spiritual themes that bridge Impressionism and modernism.
  • D. tapestry cycle
    A tapestry cycle is a series of related woven hangings designed and produced as a coordinated group to depict a continuous narrative, theme, or set of events.
  • E. mythological painting
    A mythological painting is an artwork that visually represents stories, characters, and events from myths, legends, or ancient religions, often imbued with symbolic meaning and cultural significance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ef17708190bdf7e2adbf14ddc2 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:12 a.m.