Triple

T17778466
Position Surface form Disambiguated ID Type / Status
Subject Eje Central E443834 entity
Predicate hasConnection P8776 FINISHED
Object Eje Central trolleybus corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eje Central trolleybus corridor | Statement: [Eje Central, hasConnection, Eje Central trolleybus corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eje Central trolleybus corridor
Context triple: [Eje Central, hasConnection, Eje Central trolleybus corridor]
  • A. Monumental Axis bus corridor
    The Monumental Axis bus corridor is a dedicated high-capacity public transport route running along Brasília’s central Monumental Axis, serving as a key spine for urban mobility in Brazil’s capital.
  • B. E16 corridor
    The E16 corridor is a major European route and transport corridor in Norway that connects key inland regions and facilitates travel between Oslo and western Norway.
  • C. Trolleybus Line 2
    Trolleybus Line 2 is an electric trolleybus route that forms part of an urban public transit network and interchanges with Metrobus Line 5.
  • D. Trolleybus Line 1
    Trolleybus Line 1 is an electric trolleybus route in Mexico City’s public transit system that connects various central neighborhoods and interchanges with the metro network.
  • E. South Busway
    South Busway is a dedicated bus rapid transit corridor in Pittsburgh, Pennsylvania, providing faster, limited-stop service between the city's southern neighborhoods and downtown.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Eje Central trolleybus corridor
Target entity description: The Eje Central trolleybus corridor is a major electric bus rapid transit route in Mexico City that runs along the Eje Central axis, providing high-capacity, low-emission public transportation through the city’s central areas.
  • A. Monumental Axis bus corridor
    The Monumental Axis bus corridor is a dedicated high-capacity public transport route running along Brasília’s central Monumental Axis, serving as a key spine for urban mobility in Brazil’s capital.
  • B. E16 corridor
    The E16 corridor is a major European route and transport corridor in Norway that connects key inland regions and facilitates travel between Oslo and western Norway.
  • C. Trolleybus Line 2
    Trolleybus Line 2 is an electric trolleybus route that forms part of an urban public transit network and interchanges with Metrobus Line 5.
  • D. Trolleybus Line 1
    Trolleybus Line 1 is an electric trolleybus route in Mexico City’s public transit system that connects various central neighborhoods and interchanges with the metro network.
  • E. South Busway
    South Busway is a dedicated bus rapid transit corridor in Pittsburgh, Pennsylvania, providing faster, limited-stop service between the city's southern neighborhoods and downtown.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ef17708190bdf7e2adbf14ddc2 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4871f63708190b298ed96896ad0ee completed April 19, 2026, 7:41 a.m.
Created at: April 10, 2026, 10:12 a.m.