Triple

T17777540
Position Surface form Disambiguated ID Type / Status
Subject Observatorio station E443810 entity
Predicate locatedOnStreet P959 FINISHED
Object Avenida Observatorio NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Avenida Observatorio | Statement: [Observatorio station, locatedOnStreet, Avenida Observatorio]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Avenida Observatorio
Context triple: [Observatorio station, locatedOnStreet, Avenida Observatorio]
  • A. Avenida Constituyentes
    Avenida Constituyentes is a key thoroughfare in Mexico City that connects the upscale Lomas de Chapultepec area with central parts of the city and provides access to Chapultepec Park.
  • B. Avenida San Jerónimo
    Avenida San Jerónimo is a major roadway in Mexico City that serves as an important traffic artery connecting the Magdalena Contreras area with other parts of the city.
  • C. Avenida Izazaga
    Avenida Izazaga is a major thoroughfare in central Mexico City, known for its heavy traffic, commercial activity, and role as a key connector between important downtown avenues.
  • D. Avenida Teniente Cruz
    Avenida Teniente Cruz is a major thoroughfare in Santiago, Chile, known for serving as a key axis in the city’s public transport network, including the Las Parcelas metro station.
  • E. Avenida Córdoba
    Avenida Córdoba is a major thoroughfare in Buenos Aires, Argentina, known for connecting central neighborhoods and serving as an important commercial and transit artery in the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Avenida Observatorio
Target entity description: Avenida Observatorio is a major thoroughfare in Mexico City that serves as an important access route to the Observatorio transportation hub and surrounding neighborhoods.
  • A. Avenida Constituyentes
    Avenida Constituyentes is a key thoroughfare in Mexico City that connects the upscale Lomas de Chapultepec area with central parts of the city and provides access to Chapultepec Park.
  • B. Avenida San Jerónimo
    Avenida San Jerónimo is a major roadway in Mexico City that serves as an important traffic artery connecting the Magdalena Contreras area with other parts of the city.
  • C. Avenida Izazaga
    Avenida Izazaga is a major thoroughfare in central Mexico City, known for its heavy traffic, commercial activity, and role as a key connector between important downtown avenues.
  • D. Avenida Teniente Cruz
    Avenida Teniente Cruz is a major thoroughfare in Santiago, Chile, known for serving as a key axis in the city’s public transport network, including the Las Parcelas metro station.
  • E. Avenida Córdoba
    Avenida Córdoba is a major thoroughfare in Buenos Aires, Argentina, known for connecting central neighborhoods and serving as an important commercial and transit artery in the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ef17708190bdf7e2adbf14ddc2 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4871e06a481909cf6d59e49dc21c5 completed April 19, 2026, 7:41 a.m.
Created at: April 10, 2026, 10:12 a.m.