Triple
T17768018
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nam Ou 3 Dam |
E443560
|
entity |
| Predicate | gridConnection |
P845
|
FINISHED |
| Object | Laos national power grid |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Laos national power grid | Statement: [Nam Ou 3 Dam, gridConnection, Laos national power grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Laos national power grid Context triple: [Nam Ou 3 Dam, gridConnection, Laos national power grid]
-
A.
Nam Ngum 5 Hydropower Project
The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
-
B.
Nam Ngum 2 Hydropower Project
The Nam Ngum 2 Hydropower Project is a large hydroelectric dam and power station in Laos developed to generate electricity and support regional energy exports, particularly to neighboring Thailand.
-
C.
Nam Ngum 1 Hydropower Project
The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
-
D.
Nam Ngum 3 Hydropower Project
The Nam Ngum 3 Hydropower Project is a large hydroelectric dam development in Laos intended to generate power from the Nam Ngum River as part of the country’s expanding regional energy export strategy.
-
E.
Nam Ngum 4 Hydropower Project
The Nam Ngum 4 Hydropower Project is a planned hydroelectric power development in Laos designed to generate electricity from the Nam Ngum River as part of the country’s expanding hydropower sector.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Laos national power grid Target entity description: The Laos national power grid is the countrywide electrical transmission and distribution network that delivers hydroelectric and other generated power to consumers across Laos and for export to neighboring countries.
-
A.
Nam Ngum 5 Hydropower Project
The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
-
B.
Nam Ngum 2 Hydropower Project
The Nam Ngum 2 Hydropower Project is a large hydroelectric dam and power station in Laos developed to generate electricity and support regional energy exports, particularly to neighboring Thailand.
-
C.
Nam Ngum 1 Hydropower Project
The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
-
D.
Nam Ngum 3 Hydropower Project
The Nam Ngum 3 Hydropower Project is a large hydroelectric dam development in Laos intended to generate power from the Nam Ngum River as part of the country’s expanding regional energy export strategy.
-
E.
Nam Ngum 4 Hydropower Project
The Nam Ngum 4 Hydropower Project is a planned hydroelectric power development in Laos designed to generate electricity from the Nam Ngum River as part of the country’s expanding hydropower sector.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9edf16c8190a59ebd245d378f4f |
completed | April 10, 2026, 8:50 a.m. |
| NER | Named-entity recognition | batch_69e485fd8aa081909c8ee9264af15c69 |
completed | April 19, 2026, 7:36 a.m. |
Created at: April 10, 2026, 10:11 a.m.