Triple

T17768006
Position Surface form Disambiguated ID Type / Status
Subject Nam Ou 3 Dam E443560 entity
Predicate isPartOfProject P14971 FINISHED
Object Nam Ou River hydropower project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nam Ou River hydropower project | Statement: [Nam Ou 3 Dam, isPartOfProject, Nam Ou River hydropower project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nam Ou River hydropower project
Context triple: [Nam Ou 3 Dam, isPartOfProject, Nam Ou River hydropower project]
  • A. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • B. Nam Ngum 2 Hydropower Project
    The Nam Ngum 2 Hydropower Project is a large hydroelectric dam and power station in Laos developed to generate electricity and support regional energy exports, particularly to neighboring Thailand.
  • C. Nam Ngum 1 Hydropower Project
    The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
  • D. Nam Ngum 4 Hydropower Project
    The Nam Ngum 4 Hydropower Project is a planned hydroelectric power development in Laos designed to generate electricity from the Nam Ngum River as part of the country’s expanding hydropower sector.
  • E. Nam Ngum 3 Hydropower Project
    The Nam Ngum 3 Hydropower Project is a large hydroelectric dam development in Laos intended to generate power from the Nam Ngum River as part of the country’s expanding regional energy export strategy.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Nam Ou River hydropower project
Target entity description: The Nam Ou River hydropower project is a large cascade of dams and power stations on Laos’s Nam Ou River developed primarily by Chinese companies to generate electricity and support regional energy and infrastructure goals.
  • A. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • B. Nam Ngum 2 Hydropower Project
    The Nam Ngum 2 Hydropower Project is a large hydroelectric dam and power station in Laos developed to generate electricity and support regional energy exports, particularly to neighboring Thailand.
  • C. Nam Ngum 1 Hydropower Project
    The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
  • D. Nam Ngum 4 Hydropower Project
    The Nam Ngum 4 Hydropower Project is a planned hydroelectric power development in Laos designed to generate electricity from the Nam Ngum River as part of the country’s expanding hydropower sector.
  • E. Nam Ngum 3 Hydropower Project
    The Nam Ngum 3 Hydropower Project is a large hydroelectric dam development in Laos intended to generate power from the Nam Ngum River as part of the country’s expanding regional energy export strategy.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9edf16c8190a59ebd245d378f4f completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e485fd8aa081909c8ee9264af15c69 completed April 19, 2026, 7:36 a.m.
Created at: April 10, 2026, 10:11 a.m.