Triple

T17759290
Position Surface form Disambiguated ID Type / Status
Subject Interstate Bridge E443325 entity
Predicate subjectOf P38 FINISHED
Object Interstate Bridge Replacement Program NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate Bridge Replacement Program | Statement: [Interstate Bridge, subjectOf, Interstate Bridge Replacement Program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate Bridge Replacement Program
Context triple: [Interstate Bridge, subjectOf, Interstate Bridge Replacement Program]
  • A. SR 520 Bridge Replacement and HOV Program
    The SR 520 Bridge Replacement and HOV Program is a major Washington State transportation initiative to modernize the State Route 520 corridor with safer, more reliable, and transit- and carpool-focused infrastructure across Lake Washington and surrounding areas.
  • B. Interstate Bridge
    The Interstate Bridge is a pair of steel vertical-lift bridges carrying Interstate 5 across the Columbia River between Portland, Oregon, and Vancouver, Washington.
  • C. SR 520 Bridge
    The SR 520 Bridge is a major floating bridge across Lake Washington in Seattle, Washington, known as one of the longest floating bridges in the world and a key link between Seattle and its eastern suburbs.
  • D. Portland bridge system
    The Portland bridge system is the network of iconic bridges spanning the Willamette and Columbia Rivers that connect Portland’s neighborhoods and support the city’s transportation infrastructure.
  • E. North Santiam River bridge
    The North Santiam River bridge is a key roadway bridge in Mill City, Oregon, carrying traffic across the North Santiam River and linking parts of the community.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate Bridge Replacement Program
Target entity description: The Interstate Bridge Replacement Program is a bi-state infrastructure initiative to plan and construct a modern, seismically resilient replacement for the aging Interstate Bridge over the Columbia River between Oregon and Washington.
  • A. SR 520 Bridge Replacement and HOV Program
    The SR 520 Bridge Replacement and HOV Program is a major Washington State transportation initiative to modernize the State Route 520 corridor with safer, more reliable, and transit- and carpool-focused infrastructure across Lake Washington and surrounding areas.
  • B. Interstate Bridge chosen
    The Interstate Bridge is a pair of steel vertical-lift bridges carrying Interstate 5 across the Columbia River between Portland, Oregon, and Vancouver, Washington.
  • C. SR 520 Bridge
    The SR 520 Bridge is a major floating bridge across Lake Washington in Seattle, Washington, known as one of the longest floating bridges in the world and a key link between Seattle and its eastern suburbs.
  • D. Portland bridge system
    The Portland bridge system is the network of iconic bridges spanning the Willamette and Columbia Rivers that connect Portland’s neighborhoods and support the city’s transportation infrastructure.
  • E. North Santiam River bridge
    The North Santiam River bridge is a key roadway bridge in Mill City, Oregon, carrying traffic across the North Santiam River and linking parts of the community.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9edf16c8190a59ebd245d378f4f completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e48420ad188190aeb0f4ec1d23ee5c completed April 19, 2026, 7:28 a.m.
Created at: April 10, 2026, 10:10 a.m.