Triple

T17757238
Position Surface form Disambiguated ID Type / Status
Subject Valdez Hall E443274 entity
Predicate instanceOf P0 FINISHED
Object convention center facility C3167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: convention center facility
Context triple: [Valdez Hall, instanceOf, convention center facility]
  • A. convention center chosen
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • B. conference center
    A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
  • C. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • D. convention hotel
    A convention hotel is a large lodging facility specifically designed to host conferences and events, featuring extensive meeting spaces, ballrooms, and business amenities alongside standard guest accommodations.
  • E. multi-purpose event venue
    A multi-purpose event venue is a flexible space designed to accommodate a wide range of gatherings—such as conferences, concerts, weddings, and exhibitions—by offering adaptable layouts, technical infrastructure, and support services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9edf16c8190a59ebd245d378f4f completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:10 a.m.