Triple

T17750867
Position Surface form Disambiguated ID Type / Status
Subject Srinagar–Jammu National Highway corridor E443107 entity
Predicate instanceOf P0 FINISHED
Object strategic transport corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: strategic transport corridor
Context triple: [Srinagar–Jammu National Highway corridor, instanceOf, strategic transport corridor]
  • A. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • C. trade and transportation corridor initiative
    A trade and transportation corridor initiative is a coordinated program to develop and optimize key routes, infrastructure, and policies that facilitate efficient movement of goods and people across regions or borders.
  • D. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • E. strategic military route
    A strategic military route is a planned path or corridor used to move troops, equipment, and supplies efficiently while maximizing operational advantage and minimizing vulnerability to enemy action.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ed3a2081909b2ec0d4dd2f4c37 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:10 a.m.