Triple

T17750254
Position Surface form Disambiguated ID Type / Status
Subject Kotelnica Białczańska E443092 entity
Predicate hasApproximateOpeningMonths P100126 FINISHED
Object December LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: December | Statement: [Kotelnica Białczańska, hasApproximateOpeningMonths, December]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasApproximateOpeningMonths
Context triple: [Kotelnica Białczańska, hasApproximateOpeningMonths, December]
  • A. openingDateApproximate
    Indicates that the date when something was opened or began is not known exactly and is only an approximate value.
  • B. operatingMonthsApproximate chosen
    Indicates that the time period during which something operates is specified in approximate months rather than exact dates.
  • C. typicallyOpenFromMonth
    Indicates the month from which something (such as a place, service, or facility) is usually open or begins operating.
  • D. plannedOpeningDate
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • E. expansionOpeningDate
    Indicates the date on which an expansion of something (such as a facility, service, or project) was officially opened or became operational.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ed3a2081909b2ec0d4dd2f4c37 completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4841a401c8190ae1dc0ed7ae4cc26 completed April 19, 2026, 7:28 a.m.
PD Predicate disambiguation batch_69e3cde9dc288190af0e2198487f2051 completed April 18, 2026, 6:31 p.m.
Created at: April 10, 2026, 10:10 a.m.