Triple

T17741488
Position Surface form Disambiguated ID Type / Status
Subject Doton’s Point E442868 entity
Predicate instanceOf P0 FINISHED
Object shoreline access area C33405 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: shoreline access area
Context triple: [Doton’s Point, instanceOf, shoreline access area]
  • A. public shoreline chosen
    A public shoreline is a coastal area legally accessible to all people for recreation, passage, and enjoyment, typically protected by regulations that prevent exclusive private ownership or obstruction.
  • B. beach area
    A beach area is a coastal zone where land meets a body of water, typically featuring sand or pebbles and used for recreation, relaxation, and shoreline activities.
  • C. seaside facility
    A seaside facility is a coastal establishment that provides services, amenities, or infrastructure for recreation, tourism, or marine-related activities along the shoreline.
  • D. coastal reservation
    A coastal reservation is a protected shoreline area designated to conserve marine and coastal ecosystems while allowing limited, sustainable human use and cultural activities.
  • E. coastal landslip area
    A coastal landslip area is a section of shoreline where unstable cliffs or slopes have partially collapsed or slid due to natural processes like erosion, weathering, and gravity, creating a hazardous and dynamically changing landscape.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ed3a2081909b2ec0d4dd2f4c37 completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:09 a.m.