Triple

T17725261
Position Surface form Disambiguated ID Type / Status
Subject Dubai Investment Park Metro Station E442445 entity
Predicate line P1293 FINISHED
Object Red Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Line | Statement: [Dubai Investment Park Metro Station, line, Red Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Red Line
Context triple: [Dubai Investment Park Metro Station, line, Red Line]
  • A. Red Line
    The Red Line is one of the primary heavy-rail rapid transit routes in Atlanta’s MARTA system, running north–south and serving key destinations across the metropolitan area.
  • B. Red Line
    Red Line was the original name of Los Angeles Metro’s B Line, a heavy-rail subway corridor serving key neighborhoods between Downtown Los Angeles and North Hollywood.
  • C. Red Line chosen
    Red Line is one of the main rapid transit routes of the Dubai Metro, running along key areas of the city and serving many of its major commercial and residential districts.
  • D. Red Line
    The Red Line is one of the main lines of the Stockholm metro system, running from Norsborg and Fruängen in the southwest through central Stockholm to several northeastern suburbs.
  • E. Red Line
    The Red Line is one of the main light rail routes of Dublin’s Luas tram system, running east–west across the city and serving key central and suburban areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e47489c59c8190bbffefad20dc6346 completed April 19, 2026, 6:22 a.m.
Created at: April 10, 2026, 10:07 a.m.